For the design and manufacture, Boeing calls on manufacturers from around ten countries: the large Japanese groups and the Italian Finmeccanica (from 2017 Leonardo), loyal allies of Boeing, but also suppliers in Australia, Canada, China, South Korea, UK, Sweden and France.The first flight of the Boeing 787 takes place on December 15, 2009 at 10:27 UTC-8 at Everett from Paine Field located next to the Boeing factory.Boeing announced on August 17, 2011 that it had completed the flight tests necessary for the certification of the Boeing 787-8 equipped with Rolls-Royce Trent 1000 engines.On October 28, 2009, Boeing announced the opening of a second Boeing 787 assembly line in North Charleston, South Carolina.The aircraft carries between 210 ...
2664 words (6.7 pages)
.. • Boeing has gone the extra distance with the 787 program — retains only about 33%-35% of the total 787 work share .The A350 is designed to compete with the Boeing 777 and the Boeing 787.The Boeing 787 experience represents a unique model for the future in supply chain management.• In Japan: 80% of orders from Japanese airlines from Boeing during last decade; Japanese suppliers (“heavies”) account for 35% of 787 work-shares.With this purpose, this final paper will provide an overview of the supply chain management practices by Airbus and Boeing in their new products as Airbus A350 XWB (Extra Wide Body) and Boeing B787 Dreamliners and how the both aircraft manufactures apply lean process management.
4329 words (10.8 pages)
A trial even took place, Boeing was convicted in October 2004 for influence peddling, and Darleen Druyun, a Pentagon employee who had started negotiating a job at Boeing that she had previously the following materialized, nine months in prison.Boeing's return to number one manufacturer position with the Boeing 777 is further reinforced by the unprecedented success of the Boeing 787 Dreamliner 684 units have been ordered, which calls into question the relevance of the choices made by Airbus management.These difficulties appear serious, to the point that Boeing has already announced the cancellation of a version of the 787 ordered only by Japanese companies, which puts them in trouble.While the difficulties encountered by Boeing in develop...
5307 words (13.3 pages)
In the past, Boeing would produce all the engineering specifications (including mandating construction processes) to its vendors who, then, produced the aircraft subassemblies and ship them to a Boeing assembly facility for final build-out.That gap went both ways as the vendors sometime did not give Boeing adequate specifications information and some of the vendors felt that Boeing did not disclose all appropriate specification information to them.The engineers and business development divisions at Boeing decided to utilize carbon fiber material for the majority of the 787 airframe structure.When Boeing began the 787 program, the company leadership decided to outsource many of the engineering functions to their other vendors.Although the...
1404 words (3.5 pages)
Norris, G & Wagner M 2009, Boeing 787 Dreamliner, Zenith Press, Minneapolis, MN.Reduced operating costs are mainly achieved through the fact that the Boeing 787 consumes lesser fuel compared to other models of similar size.The Boeing 787 has been one of the most successful aircrafts in the twenty first century because of its technological advancement that offer numerous benefits to both airlines and their customers.Vos, R, & Henk, H 2011, Boeing 787 Dreamliner: De droom die uitkwam, De Alk, Cop.Norris, G, Geoffrey, T, Mark, W & Christine, FS 2005, Boeing 787 Dreamliner: flying redefined, Aerospace Technical Publications International, Perth.
1612 words (4.0 pages)
The development of this state-of-the-art airplane will include an international team of aerospace companies led by Boeing.The Boeing team must consider the risk factors that are contributing to these risks and continue to formulate mechanisms to reduce this risk.Uncertainty in construction projects including that of constructing the Boeing 787 Dreamliner may arise from many sources and often involves many participants in the project.Boeing expects sales of 3,500 units over the next 20 years.Boeing Commercial Airplanes’ launched the 787 Dreamliner, a super-efficient airplane in order to meet the growing needs and preferences of an international audience across the globe.
2628 words (6.6 pages)
The 787 Dreamliner is yet another example of The Boeing Company’s innovation as the 787 ushers in a new era of aircraft construction and performance.Currently, The Boeing Math Group is collaborating with other internal business units at The Boeing Company in order to develop the 787 Dreamliner.Boeing Engineering, Operations, and Technology develops new strategic programs, provides innovative technology and process solutions, has transformed Boeing into a global network-centric enterprise, enhances and protects the company’s intellectual capital, and fosters a culture of innovation within The Boeing Company.The Boeing Company wants to use this model to phase out the 767 (Boeing, 2006).The Boeing Company is organized into three business un...
8881 words (22.2 pages)
Boeing the world’s largest commercial aircraft producer has made outsourcing its primary means for development of its groundbreaking commercial aircraft, the Boeing 787 Dream-liner.Boeing 787 delays: will the seventh missed deadline be the last?Scott Hancher, the Boeing 787 programs third director, seems incline to blame the delays on instrument changes and suppliers inability to properly install parts for the tail-wing.McInnes (2008) was correct when he asserted that with a consortium of EADS (owners of Airbus) and Northrop Grumman winning a 40 billion dollar order from the United States government to build 179 refueling aircraft for the US Air Force, Boeing could do good with just getting the 787 certified and get on with deliveries as...
2196 words (5.5 pages)
However, after few years of manufacturing delay and engine development, Boeing 787 is now officially launched to public.According to Jime Jemieson , Boeing Chief Technology Officer, the operation in technologies and other processes of the Boeing are founded on its company funding, other resources, and immediate demands.The company anticipates that R&D is the primary factor which able to gain money for Boeing and its stakeholder; so, Boeing invests about 4% of company’s revenue each year in R&D which is calculated to more than $2 billion.This research aims to focus on the innovation, which considered as the most strength of Boeing, regarding to the newest product which is being called Boeing 787 Dreamliner; it currently makes a b...
1904 words (4.8 pages)
As the project involved more amounts of risk factor I would suggest Boeing would have been involved in every phase of project completion, so as to get correct updates and to speed up the work than deadline estimated, which would have resulted in rise of fame and reputation of Boeing for producing aircraft at very cheap cost than estimated.Boeing during 2003 lost its share value to Airbus which is a strong opponent to it (Boeing Corporation, 2014).But this step backfired in getting air bubbles on the skin of fuselage and nose during assembling of aircraft which resulted in delay of 787 Dreamliner (Pearlson & Saunders, 2013) Boeing in the process of reduction in time and cost it opted a supply chain process in which it adopted from Toy...
1605 words (4.0 pages)
Certainly, Boeing has had immense success in finding orders and obligations for the 787 since it was initiated more than eighteen months before, it ended up having three hundred orders by June 2005.Statistics reveal that Airbus and Boeing as of 2005 show that, Airbus has been capable of defeating Boeing on subject of deliveries for a consecutive second year.With Boeing’s restored sales strength owing to the 737 and 787, Boeing is without difficulty placed to recuperate the market share it lost during the previous 4 years.The caption in the clash between Airbus and Boeing paid attention to the A380, the A350 and Boeing’s 787.Therefore, Boeing believes that these counterbalancing contracts are feasible for the business.
3097 words (7.7 pages)
Furthermore, Boeing and Airbus could raise the market entry barrier by setting up the standards of the industry to prevent potential competitors from entering.Development Process The development process of the 787 is considered as revolutionary compared to all Boeing’s previous product developments.To avoid these from happening, Boeing should take back the entire R&D of the 787 parts.Another simple reason for the potential success of the 787 is that, if not seen as profitable, Airbus would not be interested in launching a direct competing model, the A350.They could share the market by separating it into two broad categories, one for larger aircrafts, the A380, and another for smaller jetliners, the 787.
505 words (1.3 pages)
Have these types of payments provided Boeing with unfair advantages?Historically, competition between Airbus and Boeing has been happened in the large jet airliner market since the 1990s.The European countries also complain Boeing had received launch aid from Japan particularly for the large part like wing.This resulted from a series of mergers within the global aerospace industry, with Airbus beginning as a European consortium while the American Boeing absorbed its former arch-rival, McDonnell Douglas in a 1997 merger.The previous case brought up by Boeing has become the concern of WTO and as the result EU was found as not compliance to WTO ruling regarding the interest rate being charged on loan given to Airbus.
2989 words (7.5 pages)
787 Who’s Building the 787 Dreamliner.4.4 The financial evidence suggests that Boeing and the 787 project management team did not fully understand the complexities of out-sourcing (Goatham, 2014).2.2 Boeing commercial aircraft division is a successful aircraft manufacturing company with a proud history of in-house design and manufacture (Boeing, 2014).4.3 Initial budget estimates from Boeing set the 787 costs at about $5 billion (USD).4.2 Early project management decisions to move away from the Boeing model of in-house design and manufacture (Boeing, 2014), to a model of out-sourcing large subassemblies and component sections to around fifty Tier 1 partners (Boeing Company, 2013), would prove disastrous in estimating development costs (O...
1211 words (3.0 pages)
The Leadership Team sets strategic direction through Boeing Combined Planning Process .This grouping of processes focuses on developing and implementing strategies that use Being’s Vision and Values to enhance customer satisfaction, improve processes, and increase Boeing market position.The 787 has more foreign-made content 30% than any other Boeing plane, according to the Society of Professional Engineering Employees in Aerospace, the union representing Boeing engineers.Assembly issues continue to slow delivery of the Boeing 787 Dreamliner, which is now almost three years behind schedule.These two partnerships allow for Boeing to grow into the aerospace industry, and allow Boeing to have a wider range of products for a wider range of cu...
3943 words (9.9 pages)
Instead Boeing allowed the companies to create their own design which cause problems at the assembly plant.Other countries have become more efficient at producing certain components, and Boeing is only attempting to use the best possible experts in building its airplane Conclusion .While some see the Boeing 787 Dreamliner as a outsourcing fiasco, it has proved the opposite.While the risks could have been mitigated with a bit more planning and oversight, it has given Boeing the advantage it needed to edge out its competition and secure enough orders for its aircraft to ensure economies of scale will make the 787 profitable.Overhead such as office space cost, amount for a large portion, and by limiting the number of employees involved in...
1301 words (3.3 pages)
In December 2006, Boeing announced that the LCF would also be designated Dreamlifter (in reference to the 787 nicknamed Dreamliner) and unveiled the livery of the aircraft bearing the Dreamlifter logo whose graphics are reminiscent of the Dreamliner.On October 13, 2003, Boeing announced that due to the length of ship deliveries, air transport would be the primary method of transporting 787 components (then referred to as 7E7).It is more economical for Boeing to buy planes and convert them than to manufacture them entirely.If Boeing had built the LCF entirely, the aircraft would have had to undergo years of development and testing like every new aircraft introduced to the market.Therefore, the LCF is not an aircraft produced directly by B...
715 words (1.8 pages)
(Boeing, 2014) It is interesting to me that stakeholder success is the last item on the list.The need to be perceived in the public arena as ethical and trustworthy while also remaining in compliance with very lofty government standards demonstrates how Boeing and the aerospace industry strive to perform at a level which helps to mitigate the need for public or social pressure to influence their decisions.For example, last year Boeing experienced a public relations nightmare when their new 787 Dreamliner aircraft experienced problems with Lithium Ion Batteries.Everything Boeing and its employees do have the potential to impact the public trust.The level of trust that must be present by the public in the company that builds the airplane t...
1049 words (2.6 pages)
Boeing initially offered only converted Boeing 737s.The BBJ MAX 8 and 9 are based on the fourth generation models of Boeing 737 MAX 8 and 9. .Faced with the success encountered, the BBJ fleet has expanded with the Boeing 777 VIP, Boeing 787 VIP and Boeing 747-8 VIP with larger payload capacities and increased radiuses of action.The Boeing Business Jets (BBJ) are a range of airliners specially designed for private use created by Boeing in 1996.At the end of 2012, Boeing announces the marketing of the BBJ MAX 8 and BBJ MAX 9 models, respectively based on the 737 MAX 8 and 737 MAX 9.
589 words (1.5 pages)
Japan also helped with building the newest Boeing 787 Dreamliner.New product development efforts are focused on the Boeing 787 Dreamliner, and the 747-8. .Boeing has learned that it is necessary to find the right balance between the production of components in its own plant and production acquired from outside companies.Boeing, along with Airbus, is dominating in the airline industry and is therefore a very important customer for all its suppliers.Boeing believes they failed by giving outsiders too much responsibility for designing integral parts of the aircraft.
2706 words (6.8 pages)
According to Boeing, the 787 is the result of over a decade of focus groups and scientific studies to gain a better understanding of passenger comfort and how the design of airplane interiors can make flying a more pleasant experience.However with regard to the net order share, in the last ten years, Airbus has overtaken Boeing in the race with 64% market share while Boeing is left with only 36% as of in the year 2009.Boeing – Boeing ventured into the commercial aviation sector first in 1958 with the 707, its first commercial jet airliner.Similarly, the 787 is estimated to have cost Boeing over $10 billion in pure development costs alone.Now, since the market itself was a slow cycle market, with each advance and change in technology taki...
4785 words (12.0 pages)
Now, since the market itself was a slow cycle market, with each advance and change in technology taking a long time to fructify, Boeing was not wildly successful with its First Mover’s Advantage.Similarly, the 787 is estimated to have cost Boeing over $10 billion in pure development costs alone.Recognizing this very fact, the various constituent members of Airbus came together to form the consortium and take the fight to Boeing, which always ha .Airbus, as compared to Boeing, could be classified as the second mover.According to Boeing, the 787 is the result of over a decade of focus groups and scientific studies to gain a better understanding of passenger comfort and how the design of airplane interiors can make flying a more pleasant ex...
4769 words (11.9 pages)
To integrate the supply chain better, Boeing needed to have a full understanding of supply chain management and monitor it closely using IS.Boeing took an aggressive approach to apply their techniques.Boeing did not have the necessary technology to fulfill the needs of the 787 Dreamliner which unfortunately caused it to have many delays and problems.Boeing adopted the radical change approach for designing and developing the 787 Dreamliner because they were in competition with Airbus and needed a new approach in which they could use innovation to stand out upon their competitiors.The plan at Boeing was to use various suppliers in which would each have expertise over the different parts of the plane to quicken the process, when it reality ...
708 words (1.8 pages)
The threat of substitute products for Boeing can be a difficult task.In fact they were recently given awards by Boeing as a result of being such good partner-suppliers.Currently, Boeing is looking for technological changes to create a competitive edge for their newest project, the 787 dream liner, to outperform their leading competitor, Airbus.“Boeing is looking to sell aircraft to Taiwan and china does not like the idea of this happening since they are the largest stakeholder to both the United States and Boeing (Cohan 2010)”.In fact, Boeing has been working on their latest commercial plane the 787 dream liner.
2074 words (5.2 pages)
The main former competitors have exited civil aircraft manufacturing market, for instance, Boeing merged with McDonnell Douglas Corp in August 1997 (Boeing, 2010a), and left Airbus and Boeing operating in a near duopoly global market.Boeing now headquartered in Chicago and employs more than 158,000 people in 70 countries with $60.9 billion revenue in 2008 which founded in 1916 (Boeing, 2010b).On the other aspect, Airbus and Boeing received government aid from Europe and United States respectively.In addition, Boeing announced General Electric and Rolls-Royce have developed new engines which will improve the fuel efficiency approximately 20% compared to Boeing 767 (Boeing, 2010c).For example, Gresing and Johnsson (2007) cited pure develop...
1271 words (3.2 pages)
4)What marketing recommendations would you make to McNerney as he continues to try to resolve the problems with the 787 Dreamliner program?Boeing is a famous aircraft manufacture in the world, and also the largest plane manufacture in the world.3)Discuss the customer buying process for a Boeing airplane.Boeing try to design a new aircraft can use less fuel, that’s what buyer want.Thus reputation is very important for them, even more important than technique.
423 words (1.1 pages)
The plane is designed at Global Collaboration Environment, a special online site maintained by Boeing.Boeing also uses the new partnership to solicit ideas of how to improve designs, integration, and so on.Companies in these countries may then buy from Boeing.But now the company is undertaking a far-reaching transformation as it uses cutting-edge materials and electronics and high-level technology for the design and assembly process of its new passenger plane –the Boeing 787.A visualization application developed by Boeing allows the teams to do real-time design reviews of complex geometry without any Lag time as the models load.
839 words (2.1 pages)
Seeing the response of the 787, Airbus also announced its new model, the A350 that would compete with the 787.Boeing spent almost $5 billion on the development of the 777 and $8 billion on the 787.The Boeing Company was started by William Boeing in 1916, in Seattle.Initially it was agreed between Boeing and Airbus that the project would be a joint one but later (1995), Boeing backed out saying that the costs were too much and the demands were not certain.The Japanese companies that had previously worked for Boeing namely Mitsubishi Heavy Industries, Kawasaki Heavy Industries and Fuji Heavy Industries were subcontracted 35% of the work and around 26% of the work was subcontracted to Italian companies, mainly Alenia.
2767 words (6.9 pages)
What can a company like Boeing do to make sure such problems do not occur?What are the causes of these problems?* Outsourcing the state-of-the-art electronics on the flight deck and in the passenger compartments allowed Boeing to reduce the risks associated with this technological gamble; * Boeing was able to negotiate $8 billion in development costs from the partners in return for a share of the work; * Boeing was able to access the expertise of the most efficient developers/manufactures worldwide and this, in turn, drove down the cost of delivering the 787; * Boeing believed that outsourcing some work to foreign countries would help sales in those countries; * Outsourcing the design of many of the components might reduce time to develo...
290 words (0.7 pages)
A good example is the blended wing of the Boeing 787 shown in Figure 12.Figure 13 shows the projected savings on the Boeing 787 aircraft which utilises a high percentage of composites in its construction.• Advanced Composite Repair for Engineers, 1996, Boeing Technical Training.• Tim Nelson, 2005, 787 Systems And Performance, Flight Operations Engineering, Boeing Commercial Airplanes.This does not compare well with the Boeing 767, the aircraft that the 787 is replacing.
2197 words (5.5 pages)